The Anil Agarwal International Cricket Stadium in Jaipur, also known as the Vedanta Stadium, is poised to be one of the largest cricket facilities globally. Located on a sprawling 100-acre plot along Delhi Road, it will feature a seating capacity of 75,000, making it the second-largest stadium in India after the Narendra Modi Stadium in Ahmedabad.
The stadium is being developed in two phases at a total cost of ₹650 crores, with Hindustan Zinc Limited contributing ₹300 crores for the first phase, which will initially accommodate 40,000 spectators. Facilities will include 11 match-ready pitches, two practice grounds, a cricket academy, player dressing rooms with state-of-the-art amenities, and provisions for hosting back-to-back matches. Additionally, the stadium will house VIP suites, a sports club, a gym, and expansive parking.
Expected to set new standards for cricket infrastructure in India, it will also incorporate eco-friendly measures and high-tech installations like sensor-enabled doors and smart lighting in VIP areas. Completion of the basic structure is targeted by the end of this year, with full completion in five years.
A Comprehensive Overview
Location and Importance
Situated along Delhi Road in Jaipur, Rajasthan, the Anil Agarwal International Cricket Stadium, also referred to as the Vedanta Stadium, is a monumental project designed to boost cricket infrastructure in India. It aims to serve as a significant hub for international matches and cricket development programs.
Stadium Features
1. Seating Capacity:
- When fully completed, it will hold 75,000 spectators, making it the second-largest stadium in India and the third-largest globally after the Narendra Modi Stadium (Ahmedabad) and Melbourne Cricket Ground (Australia).
2. Construction Phases:
- Phase 1: Construction underway to accommodate 40,000 seats at a cost of ₹400 crores. Expected to be operational within a few years.
- Phase 2: Additional seating for 35,000 spectators, bringing the total capacity to 75,000.
3. Facilities and Amenities:
- Pitches: 11 match-ready pitches meeting international standards.
- Practice Grounds: Two practice areas for team training.
- Cricket Academy: An advanced training center for budding cricketers, supported by international coaches.
- Player Comforts: Dressing rooms with jacuzzis, steam baths, and high-tech amenities.
- Luxury Features: VIP boxes with sensor-enabled doors and smart lighting systems.
- Additional Infrastructure: A sports club, gymnasium, hostel for players, and a large parking facility.
Environmental and Technological Innovations
The stadium will incorporate eco-friendly practices such as sustainable materials and energy-efficient systems. Smart technologies like automated lighting and access controls enhance the spectator and VIP experience.
Investment and Funding
The project is being funded in partnership with Hindustan Zinc Limited, which has contributed ₹300 crores. The remaining costs are managed by the Rajasthan Cricket Association (RCA). The total investment for the stadium is approximately ₹650 crores.
Completion Timeline
The basic structure of Phase 1 is expected to be ready by 2025. The entire stadium is projected to be completed within five years, with a grand inauguration planned for 2029.
This state-of-the-art facility promises to be a cricketing marvel and is poised to strengthen India’s position as a global cricketing destination.